Tired of HDD drilling delays from underperforming motors? Frustrated by seal failures that waste mud and hike costs? Struggling to find hole openers that fit every 10″-24″ project need?
Your Solution Is Here—Click to Transform Your Drilling Efficiency!
1. 102mm NC 31 Mud Motor (4.5m): End Drilling Downtime for Good
HDD projects can’t afford slow rotation or weak torque. Our 102mm NC 31 mud motor (4.5m length) crushes these pain points:
30% Faster ROP (Rate of Penetration): High-torque design powers through tough formations (sandstone, shale) without stalling—cutting project timelines.
Ultra-Stable 4.5m Body: Reduces vibration during horizontal drilling, preventing tool wear and costly reworks.
NC 31 Compatibility: Seamlessly connects to standard HDD drill strings—no extra adapters, no setup delays.
2. Hole Openers (10″,12″,14″,16″,18″,20″,22″,24″): One Range for Every Hole Size
Stop swapping multiple tools for different 孔径 (hole diameters)! Our full-size hole openers solve “one-size-fits-no-one” headaches:
Full 10″-24″ Coverage: From small pilot holes to large-diameter crossings—one product line meets all project needs.
Durable Tungsten Carbide Inserts: Resist wear in abrasive soils, lasting 2x longer than standard openers.
Smooth Hole Walls: Precision cutting reduces friction for easier pipe pullback—no more stuck casings.
3. NC 31 Composite Seal: Zero Mud Leakage, Zero Cost Wastage
Seal failures are HDD’s silent budget killer (wasted mud, environmental risks, downtime). Our NC 31 composite seal eliminates this:
100% Leak-Proof Design: Advanced composite material withstands high pressure (up to 5,000 psi) and temperature swings—no more mud loss.
50% Longer Service Life: Outlasts rubber seals, cutting replacement frequency and maintenance costs.
NC 31 Perfect Fit: Designed for our 102mm mud motor (and all NC 31 connections)—no mismatches, no seal damage.
Ready to Cut Costs & Speed Up Your HDD Projects?
Every minute of downtime costs you money. Click now to:✅ Get a free project-specific quote✅ Request on-site testing of the 102mm NC 31 mud motor✅ Learn how our full-size hole openers save 20+ hours per project
Don’t Let Pain Points Slow You Down—Click Here to Upgrade Your HDD Drilling Today!-www.chinafareastern.com
Post time: Sep-30-2025